Completed show-flat kitchen in matte warm white handleless cabinetry with pale oak tall units for a multi-unit development — concept render by Symatti

Concept render · illustrative of finishes available

SOLUTION

Developer & Multi-Unit Cabinetry Supply

Multi-unit cabinetry is a promise made hundreds of times at once: every kitchen identical, every delivery on the critical path. Our production system exists to keep that promise at development scale.

Value engineering without visible downgrade

Value engineering done properly is invisible: the saving comes from smarter construction and consolidated materials, never from thinner doors or cheaper hinges where residents will feel them. We re-engineer the carcass and the supply chain, not the touchpoints.

The saving is measured against your own first-draft specification in a comparative review before you commit, and comes from standardised dimensions and bulk material purchasing — with the showroom-quality frontage intact. We quote it for your project rather than publish an average.

Holding quality constant across repeat units

Repeatability is a process, not a hope: unit types are produced as controlled batches against retained master samples, with first-article inspection on every batch. Kitchen number 200 is checked against the same standard as kitchen number 1.

Every unit leaves with a unique identifier, so site feedback maps directly to the batch and the build record — problems get isolated, not generalised.

Phasing delivery to a construction programme

Deliveries are scheduled to the build programme floor by floor or block by block, in installation order, labelled to unit level. Your site team receives what they can install that week — nothing earlier, nothing late.

Consignment size and rhythm are agreed in the supply programme and written into the contract, so the site is never holding joinery it cannot install.

Packaging, protection and site damage control

Site damage is a packaging problem before it is a workmanship problem. Units ship in export-grade protection designed for multi-handling sites, with surfaces film-protected until practical completion.

Damage reporting is standardised: photograph, quote unit ID, replacement dispatched from the next batch or from retained stock — kitchens are replaced from the next batch or from retained stock rather than reordered from scratch, so the programme recovers without a new production cycle.

Pricing structure for volume orders

Volume pricing is built on the unit-type schedule: a fixed price per kitchen type, per wardrobe type, with price breaks at agreed quantity thresholds. Variations are priced against the same schedule, so cost control survives the design-development phase.

Payment follows delivery milestones, and retention terms follow the main contract — structure and thresholds: Payment milestones and retention are fixed in the supply agreement.

SPECIFICATION SUMMARY

Unit typesFixed price per type, quantity breaks
Batch controlFirst-article inspection per consignment
PhasingAgreed per supply programme
Warranty5–10 years, terms stated in the contract

FAQ

How long does production take, and what does it cost?+

Both are confirmed per project, and deliberately so. Production time moves with panel and glass availability, finish, and how the site is accessed; cost moves with slab selection, veneer grade and hardware, because two kitchens of the same size can differ threefold on those three choices alone. What we do publish is the process: a technical review on receipt of your drawings, a fixed itemised quotation within one week, three drawing revisions included, first-article inspection before packing, full trial assembly in the workshop before dispatch, and a final check against retained samples. Send the drawing set and the finish direction, and both the schedule and the price come back in writing for your specific project.

What order size counts as multi-unit?+

Multi-unit supply usually starts at a whole floor or a single building phase; the threshold is agreed with your programme rather than fixed at a number; smaller phases of a larger scheme can be scheduled into the same agreement. Send the unit schedule for a structured quotation.

Can you match our show-unit specification?+

Yes — the show unit becomes the master sample. We can also value-engineer from it invisibly if the sales specification needs to meet a cost plan.

Do you install, or supply only?+

Both models exist: supply-and-install with our teams in supported regions, or supply-only with installation manuals, training and remote support for your own installers. Regional coverage: currently Southern China, Southeast Asia and the Middle East; elsewhere supply-only.

How do you handle design changes mid-programme?+

Changes are frozen per batch: the schedule version that a batch is built to is fixed at batch start, and later-unit changes roll into the next batch without stopping the line.

What warranty applies to volume units?+

Volume units carry the same warranty as our residential work — 5 to 10 years — with a defined defects process per consignment.

CONTINUE EXPLORING

Send the room type and the fire specification — we return per-type pricing and a phasing plan for your programme.