SOLUTION

Hotel & Hospitality Custom Millwork

Hotel millwork is a manufacturing discipline: the same wardrobe, built two hundred times, installed while the building is still being finished. We are set up for exactly that — repeatable quality at project scale.

What hospitality millwork has to survive

Guest-room joinery sees more use in a year than residential work sees in ten: luggage impacts, daily cleaning chemicals, and guests who never read the manual. Edges, hinges and finishes are specified to that duty cycle, not to showroom duty.

Replaceability is designed in — damaged fronts and tops swap out without disturbing the room’s other joinery, which keeps rooms in service and maintenance costs predictable.

Repeatable room types and unit standardisation

Project economy comes from standardisation: we fix a small set of wardrobe, minibar and desk modules per room type, then manufacture them as a controlled production run. Every room of a type receives identical joinery, verified against the approved first article.

Standardisation applies inside the modules too — shared carcass dimensions mean spare parts fit every room in the hotel for the life of the property.

Fire rating, acoustic and durability requirements

Hospitality joinery answers to regulations residential work never meets: fire-rated cores and finishes to the project’s specified class (EN 13501 B-s1,d0 or local equivalent per market), acoustic seals at corridor walls, and cleanability standards from the operator’s brand book.

We manufacture to the specified standards and supply the test documentation with the submittals, so approvals do not stall on paperwork.

Phased delivery to match a construction programme

Millwork is delivered floor by floor or block by block, packed and labelled to the installation sequence. Our production programme is built backwards from your topping-out and handover dates, with float agreed in advance.

A typical guest-room floor consignment covers 20–40 keys; phased consignments mean your installers never wait on joinery and never store it on site.

First-article approval and trial assembly

No unit is packed before it has been trial-assembled in full at the workshop and checked against the approved first article.

The approved first article becomes the physical quality standard: production units are checked against retained samples from it, not against renderings.

SPECIFICATION SUMMARY

ModulesWardrobe / minibar / desk per room type
Fire ratingTo project class B-s1,d0
ConsignmentAgreed per supply programme
ApprovalFirst-article sign-off per room type; every unit trial-assembled in full before dispatch

FAQ

How long does production take, and what does it cost?+

Both are confirmed per project, and deliberately so. Production time moves with panel and glass availability, finish, and how the site is accessed; cost moves with slab selection, veneer grade and hardware, because two kitchens of the same size can differ threefold on those three choices alone. What we do publish is the process: a technical review on receipt of your drawings, a fixed itemised quotation within one week, three drawing revisions included, first-article inspection before packing, full trial assembly in the workshop before dispatch, and a final check against retained samples. Send the drawing set and the finish direction, and both the schedule and the price come back in writing for your specific project.

What project size do you take on?+

Hotel work typically starts at 50 keys; below that, our whole-house or developer programmes are usually the better fit. Send the room schedule and we will recommend the right structure.

Can you work to our brand’s design standards?+

Yes — operator brand books are treated as manufacturing input. We map their joinery standards onto our module system and flag conflicts before pricing, not during production.

Do you handle FF&E beyond millwork?+

Our scope is fixed joinery: wardrobes, minibars, vanities, panelling, doors and corridor millwork. Loose furniture and OS&E are co-ordinated with your FF&E supplier at the drawing stage.

How do you manage quality across hundreds of rooms?+

Batch production with first-article inspection per consignment, checked against the retained first-article samples. Each consignment ships with its inspection record: 40 point checklist.

What are payment and pricing terms for hotel work?+

Hotel projects are priced per room type against your drawings and fire specification, with quantity breaks agreed in the contract. We do not publish rates per key, because fit-out scope varies too much between brands and markets; payment terms follow project milestones and are agreed in the contract. Terms are fixed in the supply agreement before production begins.

CONTINUE EXPLORING

Send the room type and the fire specification — we return per-type pricing and a phasing plan for your programme.